Dry Riser Installation in Mansfield for 74-Unit Residential Development

Dry Riser One Ltd was appointed to supply, install, test and commission a new dry riser system in Mansfield, a residential development located in Nottinghamshire. The project required a compliant dry riser installation serving the staircase with one inlet system and three landing valves positioned to support fire service access throughout the building. The works were carried out and completed in accordance with the project requirements, current British Standards and the agreed installation programme. The certificate of compliance was issued and confirms that the system was installed and commissioned in line with BS 9990:2015, with materials conforming to current British Standards.

Project Requirements

The original project scope confirmed that Dry Riser One Ltd was responsible for supplying all labour, plant and materials required to install and commission the dry riser system.

  • Initial site survey

  • 1 x Dry Riser 2 - way breeching inlet with Red Dry Riser Inlet Cabinet

  • 3 x Dry Riser Outlet Valves with Red Dry Riser Outlet Architraves and Doors

  • Galvanised steel pipework with a 12-metre horizontal run

  • System testing and commissioning

  • Certification upon completion

Our Dry Riser Installation Process

Before attending site, Dry Riser One Ltd prepared the necessary risk assessment and method statement for the works. The RAMS covered the dry riser installation including access, manual handling, loading and unloading, slips, trips and falls, hand tools, power tools, noise and fire safety controls.

The installation was completed within the staircase area and followed the issued project drawings and agreed specification. The system was installed using three outlet valves (landing valves), brackets, pipework, fittings, 90 degree and 45 degree bends.

Following installation, the dry riser system was tested and commissioned. The pressure test was carried out using a calibrated pressure gauge, helping to verify the integrity and readiness of the installed system before handover.

Testing and Certification

On completion, Dry Riser One Ltd issued a Certificate of Compliance and the certificate confirms:

  • Installation date: 19.05.2026

  • Expiry date: 18.05.2027

  • Test standard: BS 9990:2015

  • Material standard: BS 5401

  • System area: Staircase

  • Number of landing valves: 3

  • Number of systems/inlets: 1

The certificate states that the dry riser installation was completed and tested in accordance with BS 9990:2015 and BS 5401.

Dry Riser One Ltd successfully delivered a complete dry riser installation and the system was installed, pressure tested using a calibrated pressure gauge, commissioned and certified for use.

This project demonstrates our ability to provide reliable, compliant and professional dry riser installation services for residential developments, contractors and property managers across the UK.

Need a Dry Riser Installation in Mansfield or Nottinghamshire?

Dry Riser One Ltd provides professional dry riser installation, testing, commissioning, servicing and maintenance across Mansfield, Nottinghamshire and nationwide.

Contact our team today to discuss your project or arrange a site survey.

Call: 0800 061 4111
Email: enquiries@dryriserone.co.uk

⭐⭐⭐⭐⭐ Our client has already rated Dry Riser One with a 5-star review on Google following this project.


Send us your enquiry today and see the quality of our work for yourself.

Professional, efficient and friendly service. Great to work with
— Liam F.
Next
Next

The History of Dry Risers